Technical name: 0APO_NINRES
Use
Resource capacity
Capacity is relevant for multi-activity resources. Productive time is the only thing that is relevant for single-activity resources; these resources have a non-dimensional capacity 1.

A sawing device can saw a four meter long rod (maximum) into slices. You can also use multiple saws that together have a joint length of four meters (max) as multi-activity resources. The capacity of the sawing device is four meters.
Technical data
|
Available as of release |
SAP APO 3.0A |
|
Unit |
APO unit for a resource’s capacity (0APO_RUNIT) |
|
Aggregation |
Summation |
|
Exception aggregation |
Summation |