APO Maximum Overlap of Two Activities
Technical name: 0APO_MNOLP
Use
Processes on a resource can overlap each other (in terms of time) and cause a resource overload.
Specifies the maximum amount of time that a resource overload is permitted to last without the system interpreting it as a resource overload and generating an alert.
Technical data
|
Available as of release |
SAP APO 3.0A |
|
Unit |
APO unit for the maximum overlap of two activities (0APO_MNOLPU) |
|
Aggregation |
Maximum |
|
Exception aggregation |
No aggregation |