Target Lead Time  Locate the document in its SAP Library structure

Technical Name: 0C_T_LEADTIME_PP03

Use

Planned/Actual Comparison: Operation/Work Center View: This InfoObject calculates the average, target lead time per operation in the work center.

The target lead time is calculated in days and is made up of the difference in time between the target start date (which is made up from the target backflush date of the preceding operation) and the target backflush date. The minimum wait time of the preceding operation is deducted.

 

Technical Data

Available from Release

R/3 Release 3.0F

Calculation

Tgt Lead Time’ / 'Num.ProdOrd.'

 

 

 

 