Key figure APO Rate of Resource Utilization  Locate the document in its SAP Library structure

Technical name: 0APO_RSUTIL

Use

Percentage ratio between the actual available time (productive time), and the theoretically available working time of a resource.

The theoretically available working time (working time minus break times) can be reduced by organizational or technical disruptions such as broken down machines. You use the rate of resource utilization to estimate the average reduction.

The system uses the working time data and the rate of resource utilization to calculate the productive time of the resource.

Technical data

Available as of release

SAP APO 3.0A

Aggregation

Minimum

Exception aggregation

No aggregation

 

 