Technical name: SAP_BW_0ROLE_0081
Task Area
The shift manager, together with his team, is responsible for ensuring that the plan created by the production planner is carried out during a shift. His area of responsibility extends across a production area or one or more production lines.
The shift manager has personnel responsibility and sometimes also cost center responsibility for his area.
A shift manager has the following tasks:
Structure
Tasks in the Business Information Warehouse
The plant manager has administrative management functions and carries out operation/work center analyses as well as capacity and quality analyses. To accomplish these tasks, BW provides business content information in the form of workbooks. Each task corresponds to a cluster of one or more workbooks. The workbooks contain one or more queries that yield the relevant information. The tasks (clusters) are logically grouped together into task areas (subchannels). The following workbooks are available for shift managers:
Administrative Management Functions
Area to Analyze (Cluster) |
Workbook |
Cost center |
Cost center report: plan/actual comparison |
Controlling environment of cost center |
Cost center responsible for orders, projects, and networks |
|
Project report (WBS elements) | |
|
Order report | |
Human resources |
Cost center: headcount FTE |
Operation/Work Center Analyses
Area to Analyze (Cluster) |
Workbook |
Performance analysis |
Performance efficiency rate target/actual |
Production scheduling analyses |
Lead time deviations (resource) |
|
Schedule deviation (resource) | |
Production quantity analyses |
Operation quantities |
|
Target/actual material consumption | |
|
Plan realization | |
Quantities |
Operation quantities |
|
Target/actual material consumption | |
Actual data for exact periods |
Actual activities |
|
Actual quantities at the work center | |
|
Material consumption | |
Combination quantities/times |
Execution time/scrap deviations (resource) |
|
Quantities/scrap/lead time deviations (order) | |
|
Schedule and quantity deviations, work center view | |
Capacity analysis |
Capacity load utilization, distributed requirement ((>= 4.0B) |
|
Capacity load utilization, basis confirmation date | |
Duration schedule deviation |
Lead time and relative schedule deviation: work center |
|
Schedule deviations, work center view |
Capacity Analyses
Area to Analyze (Cluster) |
Workbook |
Capacity analysis |
Capacity load utilization, basis confirmation date |
Downtime |
Downtime according to categories |
|
Target/net production times | |
|
Downtimes according to downtime elements |
Quality Analyses
Area to Analyze (Cluster) |
Workbook |
Notifications |
Notification analysis - quality management |
|
Error analysis - notifications | |
Inspection results |
Inspection results, rejection proportion |
|
Inspection results, within tolerance range | |
Inspection lots |
Activities/deviations target/actual |
|
Material analysis - inspection lots |