Start of Content Area

Query Production Flexibility  Locate the document in its SAP Library structure

Technical Name: 0PP_C01_Q030

Based on InfoCube: OPP_C01

Use

This query calculates the production flexibility and displays how the production plan can handle unplanned production orders. For example, when a new, unplanned production order is entered into the system, you can use this query to determine whether the order is feasible.

Free Characteristics

Info Object

Description

0MATL_TYPE

Selection variable Material Category (optional)

0CALDAY

Selection variable Calendar Day (optional)

Variables Used

Variable

Description

0S_MATTP

Selection variable Material Category (optional)

0REDAY1

Calendar day (from/to interval)

0S_PLANT

Selection variable Plant (optional)

0S_MAT

Selection variable Material (optional)

Rows

Info Object

Description of the Info Object (and Restriction or Calculation Formula)

0PLANT

Plant

0MAT

Material

Columns

Info Object

Description of the Info Object (and Restriction or Calculation Formula)

0NO_PRODORD

Number of manufacturing orders

0NO_UNPNR

Number of manufacturing orders without planned orders

0PP_C01_CK0030

Flexibility of production plan = Number of manufacturing orders without planned orders (0NO_UNPNR) / Total manufacturing orders (0NO_PRODORD)

 

 

End of Content Area