This document contains configuration information for the Project Earned Value
app.
For information on how to configure SAP Jam, see http://help.sap.com/sapjam.
Before you can use this app, you need to configure it using the SAP Smart Business Modeler.
Note
To configure the app, please make copies of the KPI, evaluations, and drill-down configurations provided by SAP, and make your changes in these copies. Also, create your own tiles.
Please do not change the original versions provided by SAP, since new support packages and releases would overwrite your changes.
The KPI has been preconfigured as follows.
KPI ID: sap.hba.ecc.ps.ProjectEarnedValue
KPI Description: Displays the actual earned value of the project(s)
Goal Type: Range
Parameter | Value |
---|---|
SAP HANA View | - |
OData Service | /sap/hba/r/ecc/odata/ps/kpi.xsodata |
Entity Set | ProjectEarnedValueQueryResults |
Value Measure | CurPerdActualEarnedValue_E |
The following templates for evaluations, drill-downs, and tiles are provided.
Evaluation ID: sap.hba.ecc.ps.ProjectEarnedValue.ProjectEarnedValue
Parameter | Value |
---|---|
OData Service | /sap/hba/r/ecc/odata/ps/kpi.xsodata |
Entity Set | ProjectEarnedValueQueryResults |
Value Measure | CurPerdActualEarnedValue_E |
Scaling Factor | Auto |
This table shows some example values.
Parameter | Value |
---|---|
Value Type | Fixed Value |
The following tables show the input parameters, filters, and some preconfigured example values. Use your own values where required, according to the data in your backend system.
Input Parameters
Input Parameter | Operator | Value | Explanation |
---|---|---|---|
P_ControllingValueTypeForCmtmts | Equal to | 22 | Enter the Controlling Value Type for Commitments. |
P_ActualBdgtPlngVersion | Equal to | 000 | Enter the Actual budget planning version as desired. |
Filters
Filter | Operator | Value | Explanation |
---|---|---|---|
ProgressVersion | Equal to | 132 | Enter the progress version as desired. |
Project | Between | NAV_PP_DEMO_10 to NAV_PP_DEMO_15 | Enter the project for which you would like to view the earned value of the project. |
SAPClient | Equal to | 004 | Enter the SAP client you use corresponding to the SAP ERP system |
View ID: sap.hba.ecc.ps.ProjectEarnedValue.ProjectEarnedValue.sap.hba.ecc.ps.ProjectEarnedValue_sap.hba.ecc.ps.ProjectEarnedValue_1
View Title: Earned Value and Variances by Current Period
Limit Data Records: 200
Parameter | Value |
---|---|
Dimension |
|
Measures |
|
KPI Measure |
|
Bar
Single Axis
Absolute Values
Default Colors
Title (KPI): Project Earned Value
Subtitle (Evaluation): across Projects
Parameter | Value |
---|---|
Tile Format | Comparison Tile |
Navigation | Generic Drill-Down |
Sorting Order | Measure Ascending |
For information on evaluations, drill-downs, and tiles, see SAP Smart Business on SAP Help Portal:
For SAP NetWeaver 7.31:
For SAP NetWeaver 7.4: