The analytical app displays the Key Performance Indicator (KPI) WBS Element Percentage of Completion
. You can drill down to view the percentage of completion (POC) of WBS elements across projects.
You can view the planned and actual POC for WBS elements.
There are charts used to display the POC for WBS elements across periods for the current and previous fiscal year.
Note
For every fiscal year, only (01-12) periods are used to display the POC.
For a generic drill-down app, filter dimensions can be configured using the KPI Modeler. Additionally, you can configure the data representation to switch between a chart and tabular display.
Integration with the SAP Jam collaboration platform.
The app consists of front-end components and back-end components. The back-end components and the front-end components are delivered in separate products and have to be installed in a system landscape that is enabled for SAP Fiori.
SAP Smart Business Product | SAP Smart Business 1.0 for SAP ERP SPS 6 |
---|---|
Contains Virtual Data Model (VDM) | SAP HANA Live 1.0 for SAP ERP SPS 10 |
SAP Business Suite Product | SAP enhancement package 7 for SAP ERP 6.0 SPS 7 |
For more information about the system landscape to run SAP Smart Business cockpits, see Installation.
PS-FIO