This method supplies a three-colmun table with a list of the names of the days. The first column (INDEX) contains an index of 1 to 7 for the respective weekday. The second column (ID) contains the DIN abbreviation for the day. The third column (TEXT)contains the name of the day. This information is determined from the factory calender.