Start of Content Area

Process documentation SAP JRA Administration  Locate the document in its SAP Library structure

Purpose

You need to perform a number of administration activities in order to set up SAP JRA for Java-ABAP communication in your system. The following section describes the required activities.

Prerequisites

You have installed the SAP J2EE Engine.

Process Flow

The administrative activities for SAP JRA basically involve two steps:

      Deployment

      Configuration of the communication data:

In the deployment step, you provide the SAP J2EE Engine with the basic data for using SAP JRA. Configuration of the communication data involves defining the information needed for communication with the ABAP target systems.

Additional Information

You can find a detailed description of the required activities under:

      SAP JRA Deployment

      SAP JRA Configuration

 

 

 

End of Content Area