Start of Content Area
setup/clean-out order (SCM-APO-PPS)

Production Planning and Detailed Scheduling (SCM-APO-PPS)

Order within a production campaign that is used to prepare the line for production. In SAP APO, a setup order is at the beginning of a production campaign and a clean-out order is at the end.

Setup/clean-out orders serve to map setup/clean-out processes onto the R/3 or ERP system and settle them there.

End of Content Area