Background documentationSelection Parameters: Data Transfer for Contract Manufacturing

 

Using selection parameters, you determine which data the Data Transfer for Contract Manufacturing reports read in an SAP ERP system, and write to a ProductActivityNotificaton XML message. This documentation describes the selection parameters for the following reports:

  • ROEMPROACT2

  • RCMPROACT2

  • RPRTPROACT

Differences between the reports are highlighted as appropriate.

General Selection Parameters

You must restrict the selection to materials from one plant. The system always runs the report for one plant only. If you enter an MRP area, the system runs the report for exactly one combination of plant and MRP area.

Vendor (RCMPROACT2 only)

You can enter the vendor (supplier) in the Vendor field. If you do not make an entry, the report selects all vendors.

Supplier System Is Source (ROEMPROACT2 only)

As a supplier, you can also use the ROEMPROACT2 report to transfer inventory data and key figures relating to one of your suppliers (second tier suppliers) from your ERP system to SAP Supply Network Collaboration (SAP SNC) at the customer site. In this case, to indicate that you use the ROEMPROACT2 report to transfer data from a supplier ERP system to SAP SNC, you select the Supplier System Is Source checkbox. After you have selected the checkbox, the system displays additional fields. Follow the instructions in the field help on how to fill out these fields.

Selection Parameters for Material

You can restrict the selection to specific materials, product groups, MRP controllers, procurement types, and special procurement types.

Individual Batches (ROEMPROACT2 and RCMPROACT2)

The Individual Batches checkbox is only available in the ROEMPROACT2 and RCMPROACT2 reports (as of enhancement package 4 for SAP ERP 6.0). You use the checkbox as follows:

  • If you do not select the Individual Batches checkbox, the report transmits the aggregated batch quantity for a selected batch-managed material (without batch numbers).

  • If you select the Individual Batches checkbox, the report transmits the individual batches including batch numbers and batch classification values for a batch-managed material.

    Note Note

    If you have already transmitted aggregated batch inventory to SAP SNC (that is, you have not selected the checkbox) and you now want to transfer individual batches (by selecting the checkbox), you must reset the inventory in SAP SNC first. To do so, you use the Reset Inventory to Zero (/SCA/DM_RESETINV) report. This is to prevent stock values for a batch-managed material from existing twice in SAP SNC (aggregated value and values for the individual batches).

    End of the note.

If you want to use these report enhancements, you must activate the SAP ERP business function Outsourced Manufacturing (LOG_MM_OM_1).

Selection Parameters for Stock

The report's stock determination differentiates between the following types of stock:

  • Unrestricted use stock

  • Stock in quality inspection

  • Blocked stock

  • Stock in transfer between plants and stock in transfer between storage locations (as of enhancement package 4 for SAP ERP 6.0, ROEMPROACT2 and RPRTPROACT only)

    You can select these stock types individually. However, the report only transmits the total stock in transfer. If you want to use these report enhancements, you must activate the SAP ERP business function Outsourced Manufacturing (LOG_MM_OM_1).

  • Consignment stock

  • Own stock

Selection Parameters and Selection Horizon for Key Figures

You can use key figures to determine which data is extracted. You can restrict the key figure selection to a specific period.

Report ROEMPROACT2, Key Figures and MRP Elements

Inventory/Key Figure

MRP Element

Short Description

MRP Abbreviation

Inventory

CH

Batch stock

BtchSt

Inventory

LC

Batch/storage location stock

BtSLoc

Inventory

KK

Consignment stock for customer (availability check)

CCsgmt

Inventory

KB

Individual customer stock

CustST

Inventory

WB

Plant stock

Stock

Firm Demand

AR

Dependent reservations from production order

OrdRes

Firm Demand

VC

Sales order

CusOrd

Firm Demand

VW

External sales order

CusReq

Firm Demand

MR

Reservation

MtlRes

Firm Demand

NE

Network order

NtwOrd

Firm Demand

PB

Project stock

ProjSt

Firm Demand

U1

Release order for a stock transfer order

RelOrd

Firm Demand

U4

Release order for stock transport scheduling agreement (firm and trade-off zone)

ScAgDS

Firm Demand

SU

Total requirements

TotReq

Planned Demand

PP

Planned independent requirements

IndReq

Planned Demand

SB

Dependent requirements from planned order

DepReq

Planned Demand

U2

Release order for a stock transfer requisition

PRqRel

Planned Demand

U4

Release order for stock transport scheduling agreement (planning zone)

ScAgDS

Planned Demand

VE

SD scheduling agreement

SchAgr

Planned Demand

UL

Reservation in another plant

StTRes

Forecast

PR

Forecast requirements

ForReq

Subcontracting Reservation

BB

Subcontractor requirements of material provided

SubReq

Planned Receipt

LL

Forecast delivery schedule

ForcDS

Planned Receipt

JI

JIT call

JITCll

Planned Receipt

PA

Planned order

PldOrd

Planned Receipt

BA

Purchase requisition

PurRqs

Planned Receipt

LE

SA schedule line (of planning zone)

SchLne

Planned Receipt

UL

Reservation in another plant

StTRes

Firm Receipt

LF

JIT delivery schedule

JIT-DS

Firm Receipt

BE

Purchase order item schedule line

POitem

Firm Receipt

BR

Process order

PrcOrd

Firm Receipt

FE

Production order

PrdOrd

Firm Receipt

LE

SA schedule line (of firm zone and trade-off zone)

SchLne

In Transit

LA

Shipping notification

ShpgNt

Released QM Inspection Lot Stock

QM

Inspection lot for quality management

QMlot

Note Note

To send the released QM inspection lot stock data with the ROEMPROACT2 report to SAP SNC, you must implement certain SAP Notes or the respective Support Package. For more information, see SAP Note 1867428Information published on SAP site and its related SAP Notes.

End of the note.
Report RCMPROACT2, Key Figures and MRP Elements

Inventory/Key Figure

MRP Element

Short Description

MRP Abbreviation

Inventory

LK

Stock with subcontractor

SubcSt

Firm Demand

BB

Subcontractor requirements of material provided from PO and SA (of firm zone and trade-off zone)

SubReq

Planned Demand

BB

Subcontractor requirements of material provided from PR and SA (of planned zone)

SubReq

Planned Receipt

BA

Purchase requisition

PurRqs

Planned Receipt

LE

SA schedule line (of planning zone)

SchLne

Firm Receipt

BE

Order item schedule line

POitem

Firm Receipt

LE

SA schedule line (of firm zone and trade-off zone)

SchLne

In Transit

LA

Shipping notification

ShpgNt

Report RPRTPROACT, Key Figures and MRP Elements

Inventory/Key Figure

MRP Element

Short Description

MRP Abbreviation

Inventory

CH

Batch stock

BtchSt

Inventory

LC

Batch/storage location stock

BtSLoc

Inventory

KK

Consignment stock for customer (availability check)

CCsgmt

Inventory

KB

Individual customer stock

CustST

Inventory

WB

Plant stock

Stock

Firm Demand

AR

Dependent reservations from production order

OrdRes

Firm Demand

VC

Sales order

CusOrd

Firm Demand

VW

External sales order

CusReq

Firm Demand

MR

Reservation

MtlRes

Firm Demand

NE

Network order

NtwOrd

Firm Demand

PB

Project stock

ProjSt

Firm Demand

U1

Release order for a stock transfer order

RelOrd

Firm Demand

U4

Release order for stock transport scheduling agreement (firm and trade-off zone)

ScAgDS

Firm Demand

SU

Total requirements

TotReq

Planned Demand

PP

Planned independent requirements

IndReq

Planned Demand

SB

Dependent requirements from planned order

DepReq

Planned Demand

U2

Release order for a stock transfer requisition

PRqRel

Planned Demand

U4

Release order for stock transport scheduling agreement (planning zone)

ScAgDS

Planned Demand

VE

SD scheduling agreement

SchAgr

Planned Demand

UL

Reservation in another plant

StTRes

Forecast

PR

Forecast requirements

ForReq

Subcontracting Reservation

BB

Subcontractor requirements of material provided

SubReq

Planned Receipt

LL

Forecast delivery schedule

ForcDS

Planned Receipt

JI

JIT call

JITCll

Planned Receipt

PA

Planned order

PldOrd

Planned Receipt

BA

Purchase requisition

PurRqs

Planned Receipt

LE

SA schedule line (of planning zone)

SchLne

Planned Receipt

UL

Reservation in another plant

StTRes

Firm Receipt

LF

JIT delivery schedule

JIT-DS

Firm Receipt

BE

Purchase order item schedule line

POitem

Firm Receipt

BR

Process order

PrcOrd

Firm Receipt

FE

Production order

PrdOrd

Firm Receipt

LE

SA schedule line (of firm zone and trade-off zone)

SchLne

In Transit

LA

Shipping notification

ShpgNt

Selection Criteria for Supplier Data
Inventory

You can choose between the following supplier selection criteria when extracting data for inventory:

  • No Supplier Data

    The system does not consider suppliers for both un-consigned inventory and consignment inventory.

  • Supplier as Assigned

    The system extracts un-consigned inventory without supplier data and consignment inventory with supplier data.

  • With Source List and Quota

    The system provides multisourcing supplier data by source list and quota for inventory.

    In the standard system, the report stops processing the selected materials when it finds the first material without a source list. If you select the Skip Materials Without Source List checkbox, the report processes all materials that have a source list. It skips materials without a source list and puts them in the log.

  • Source List or as Assigned

    The system checks for source lists and quotas first. If there is no source list, the system extracts supplier data as it is assigned in order documents (see the Supplier as Assigned option).

Key Figures

You can choose between the following supplier selection criteria when extracting data for key figures:

  • No Supplier Data

    The system does not consider suppliers for key figures.

  • Supplier as Assigned

    The system extracts key figures with supplier data for those order items with supplier assigned; otherwise the Supplier field is empty.

  • With Source List and Quota

    The system provides multisourcing supplier data by source list and quota for key figures. For those key figures that have sources with supplier assigned, the supplier data for those order items is kept as it is. The quantity is proportional to the quota of the suppliers. If there is no source list and quota, the system generates an error message and stops processing the data.

    In the standard system, the report stops processing the selected materials when it finds the first material without a source list. If you select the Skip Materials Without Source List checkbox, the report processes all materials that have a source list. It skips materials without a source list and puts them in the log.

  • Source List or as Assigned

    The system checks for source lists and quotas first. If there is no source list, the system extracts supplier data as they are assigned in order documents (see the option Supplier as Assigned).

Execution Parameters

You can enter the following execution parameters.

  • Target system

    This parameter names the logical system to which the generated ProductActivityNotification messages are transferred. This is the logical name of the SAP NetWeaver® system. Use the logical system you entered in the partner profiles.

  • Execution mode

    You can choose between the following execution modes:

    • Test Run

      This mode allows you to run the report for test purposes, for example, without automatically creating IDocs.

    • Update Run

      In this mode, the system creates IDocs or XML messages automatically.

  • Transfer zero quantities

    You select the Transfer Zero Quantities checkbox if you want a complete update of all entries in SAP SNC. This mode transfers zero quantities (0) for stocks and demands to SAP SNC as follows:

    • Stock

      For each stock category of a material, the system generates a data segment with stock 0 (zero) unless the extractor has determined a specific value.

    • Demand

      For each date range of the demand period (usually one day), the system generates a data segment with a demand quantity, unless the system has determined specific demand information.

      Recommendation Recommendation

      We recommend only using the Transfer Zero Quantities checkbox in exceptional cases and after careful consideration. If you select this checkbox, the IDocs or XML messages that the system generates based on your selection are comprehensive.

      End of the recommendation.
Log

This parameter provides you with the following options:

  • Complete Report

    The system generates a detailed log.

  • Short Report

    The system generates a brief log including user, execution period, number of generated IDocs, and relevant suppliers.

  • Only Stock Report

    The system generates a log containing user, execution period, number of generated IDocs, relevant suppliers, and stock/requirements list for storage locations.