Scheduling Operations in Non-Working Times
Use
In the
detailed scheduling planning board, you can schedule operations using drag and drop to the regular non-working times at a resource, that is, in times where the resource is not scheduled to work. By using this strategy, you do not have to change the resource data directly when you want to finish an operation after the end of the regular working time, for example, after the end of the last shift. During the non-working time, the same capacity and the same rate of resource utilization is available as was available in the regular working time that directly preceded this. For more information, see Scheduling in Non-Working Times.
Procedure
Result
The system schedules the operation on this date when all other prerequisites are fulfilled; for example, when no constraints are violated by the schedule.
The system fixes the operations that you schedule in non-working times, that is, the operations can no longer be rescheduled. Even when you reset the indicator Non-working times, the operations remain fixed. In order to be able to reschedule the operations again, you must
undo the fix.