Troubleshooting
Check the SAP notes
of the component BC-GP on a regular basis. They contain information on program
corrections and provide additional documentation. For more information, see
also
Guided
Procedures Problem Analysis Scenarios.
The following tables show some known problems that might occur and their possible solutions.
Authorizations
Problem |
Troubleshooting information |
A content window (UI) in the GP framework remains empty. |
Check the current assignments between the users concerned and the GP Portal roles. These assignments are made in the user management administration console of the Enterprise Portal. For more information, see: ·
·
|
Connectivity to External Systems
Problem |
Troubleshooting information |
When executing a Callable Object based on an Adobe form, the system rejects the connecton (wrong ADS connectivity). |
Probably, the SLD configuration and the security settings of the ADS Web service cause the error. For more information, see:. ·
· SAP note 682619. |
Data is not transferred from the interactive form to the SAP System. |
Check the GP
service caf/eu/gp/model. Probably, the settings
for host and port are not correct. For more information, see
|
E-Mails
Problem |
Troubleshooting information |
An e-mail is not sent. |
Check the GP service caf/eu/gp/model: · Are the correct values assigned to the parameters smtp.server and smtp.service_user_mail · In connection with interactive forms: are the correct values assigned to the parameters mailconnector.start_thread and mime.id.forms.mail ? For more
information, see
|
Transports
Problem |
Troubleshooting information |
Imported GP objects are not displayed in the gallery of the GP design time. |
The parameter devobj.after_import_processing in the GP service caf/eu/gp/model defines the postprocessing for imported objects. This step (release of the GP objects) has not yet been executed. For more
information, see
|