This graphic is explained in the accompanying textExample of Product Allocation Calculation  Locate the document in its SAP Library structure

STEP 1

Period category: Monthly

Consumption period: -0/+1 (01.01.98-02.29.98)

Quantity: 100pc/month

Check date: Delivery date

Date: 01.15.98

 

Þ

Proposed date after STEP 1:

01.15.98 100pc

STEP 2

Period category: Weekly

Consumption period: -0/+8 (week 01 to week 09)

Quantity: 20pc/week

Check date: Product availability date

(-7 from delivery date)

 

Þ

Proposed dates after STEP 2:

Value 1: W 2/98 20pc

Value 2: W 3/98 20pc

Value 3: W 4/98 20pc

Value 4: W 5/98 20pc

Value 5: W 6/98 20pc

STEP 3

Period category: Daily

Consumption period: -4/+4

Quantity: 10pc/day

Check date: Delivery date (+7 days from the product availability date)

Calculation:

Value 1: 01.05.98 +7 = 01.12.98

Value 2: 01.12.98 +7 = 01.19.98

Value 3: 01.19.98 +7 = 01.26.98

Value 4: 01.26.98 +7 = 02.02.98

Value 5: 02.02.98 +7 = 02.09.98

 

Þ

Proposed dates after STEP 3:

01.12.98 10pc 01.26.98 10pc 02.09.98 10pc

01.13.98 10pc 01.27.98 10pc 02.10.98 10pc

01.19.98 10pc 02.03.98 10pc