Standard capacity
Available capacity that determines the basic resource availability.
The standard available capacity of a resource has unlimited validity and is always the same. If you are not working with different shift sequences, then the standard available capacity is sufficient for planning.
· You define the parameters for the standard available capacity for resources (single, multi, line, vehicle, and calendar resources) you planned with PP/DS on the time-continuous capacity tab page. Choose the Available Capacity pushbutton on this tab page to display the standard available capacity of the resource for the entire validity period as a list.