Key figure Window of Time Grid  Locate the document in its SAP Library structure

Technical name: 0TIME_INT

Use

This key figure indicates the window of the time grid within which a goods receipt falls.

In vendor evaluation, a grid is used to evaluate variances between the desired delivery date and the date on which delivery is actually effected.

Example

You have defined the following time grid in Customizing for Purchasing:

Window

Date variance in days

1

-2 days

2

0 days

3

2 days

4

4 days

5

6 days

Your vendor delivered the ordered material two days late. This goods receipt thus falls within window 3 of the above grid.

Technical Data

Available from Release

4.0B

Aggregation

Summation

Exception aggregation

Summation

 