Start of Content Area

This graphic is explained in the accompanying text  Planned Production Quantity  Locate the document in its SAP Library structure

Technical Name: 0PRDPLN_QTY

Use

When you are using mixed costing, this key figure contains the sum of the mixing ratios for all procurement alternatives that belong to the mixed cost estimate. If you have not defined any percentages in these mixing ratios but have instead specified the production quantity for each procurement alternative, then this key figure contains the planned quantity of this material that is to be produced or externally procured in total. The entry is made in number of base units of measure.

If you are not using mixed costing, then this key figure is empty.

Technical Data

Available from Release

4.5B

Unit

0UNIT

Aggregation

Summation

Exception aggregation

Last value

Reference characteristic: 0CCOMP_HLP

0CCOMP_HLP is an input characteristic that is linked to the characteristics cost component structure, cost component and indicator level/lower level. This makes exception aggregation possible using all and not just one of these characteristics. Exception aggregation is required because the planned production quantity is contained in all of the data records for a cost estimate. This means that were the summation to use all cost components for example, the planned production quantity which is contained in the data records for every cost component would likewise be totalled. Exception aggregation prevents the planned production quantity being totalled.