Show TOC

Background documentationRequirements Management

 

This document provides information about new, changed, and deleted functions in SAP Solution Manager 7.2 SPS 3.

Function

Type of Change

Description

More Information

Change cycle

New

You can specify how flexibly you want to manage the change cycle assignment in your IT requirement. You decide at what point in your IT requirement process you want to assign a change cycle or whether you intend to assign a change cycle at all.

SAP Solution Manager Configuration (SOLMAN_SETUP) Start of the navigation path Requirements Management Next navigation step Employ Additional Use Cases Next navigation step Assign Flexible Change Cycles End of the navigation path

Integration of solution documentation and business requirement / IT requirement

New

You can change and release solution documentation with the control of change documents. It enables you to perform and release changes in the software as well as in the solution documentation synchronously.

SAP Solution Manager Configuration (SOLMAN_SETUP) Start of the navigation path Requirements Management Next navigation step Employ Additional Use Cases Next navigation step Enable Solution Document Integration End of the navigation path

IT requirement w/o scope

New

You can use the IT requirement without maintaining scope items in the Scope assignment block. You can use the IT requirement independently of maintaining entries in the Scope assignment block. As the scope items define which change documents are created, using the IT requirement without scope means that no change documents are generated. Only the IT requirement exists.

SAP Solution Manager Configuration (SOLMAN_SETUP) Start of the navigation path Requirements Management Next navigation step Employ Additional Use Cases Next navigation step Enable Optional Scope Items End of the navigation path