Show TOC

Procedure documentationSetting up Process Integration Monitoring

 

To set up PI Monitoring, you perform several preparation steps.

Procedure

1. Configuring the managed systems

Managed System Configuration for all managed systems inside SAP Solution Manager is a prerequisite for all monitoring use cases.

You configure the managed systems in Solution Manager Configuration under  Managed Systems Configuration.

Configuring managed systems is a series of steps. For more information on each step, see the detailed help documentation in SAP Solution Manager Configuration. The steps in configuring managed systems are as follows:

  1. Select a product to assign one the following:

    • SAP NETWEAVER 7.1: Process Integration

    • SAP EHP1 FOR SAP NW PI 7.1: Process Integration

    • SAP NETWEAVER 7.3: Process Integration

    • SAP EhP1 FOR SAP NETWEAVER 7.3: Process Integration

    • SAP EhP1 FOR SAP NETWEAVER 7.4: Process Integration

  2. Connect Managed System (ABAP only)

    Note Note

    For double stack systems, e.g. Integration Server, the LMDB automatically creates technical scenarios of type “Double Stack”. You use those scenarios for configuration of double stacks.

    End of the note.
  3. Assign Diagnostic Agent

  4. Enter System Parameters

    Note Note

    For Decentral Adapter Engines (Technical Systems of type Java), it is very common in PI to use the ABAP Stack of Integration Server for Central User Administration. You can enter the required data by setting the flag Mark if system has a ABAP User Store.

    End of the note.
  5. Create Users

  6. Configure Automatically

3. Setting up System Landscape Directories (SLDs)

Setting up SLD connection, is a mandatory step. The PI domain is read from the SLD connection that is maintained. You configure the SLD in Solution Manager Configuration under Mandatory Configuration. For more information on how to set up SLD, see the guided procedure in Solution Manager Configuration underStart of the navigation path Mandatory Configuration. Next navigation step Infrastructure Preparation End of the navigation path .

4. Setting up PI Monitoring for each PI domain

The PI domain with all its PI components must be known to SAP Solution Manager for central PI Monitoring. PI domain is modeled as Technical Scenario based on LMDB data of PI domains. Various PI domains can be created

You configure the PI monitoring in Solution Manager Configuration under  Start of the navigation path Application Operations Next navigation step Integration Monitoring Next navigation step Process Integration End of the navigation path.

PI monitoring setup is a series of steps. For more information on each step, see the detailed help documentation in SAP Solution Manager Configuration.