An IT operator (or administrator) wants to initiate a change that does not have to be transported with a transport request, for example, an account number or number range change in a system. He or she creates an administrative change.
A request for change with the scope Administrative Change
has been created, approved, and assigned to a processor.
The installation for the relevant production system is assigned to the request for change.
Processing Administrative Changes
The IT operator calls up the administrative change from the change documents assigned to him or her.
In the administrative change, he or she chooses
.The status of the change is now In Process
.
The processor logs on to the Landscape
assignment block in the assigned development system and makes the requested change.
The processor returns to the administrative change and chooses Completed
.
The IT operator confirms that the change was made and chooses Confirmed
and the message is locked for any additional changes.