You can control the loading of the master data of the managed systems using TwinCubes.
On the launchpad, chooseBusiness Process Operations
. In theRelated Links
area, choose Maintain BPO Reporting Infrastructure
.
A dialog box appears.
On the Master Data
tab, select one or more rows.
You can do the following:
To control the scheduling activation, choose the Start Schedule
or Stop Schedule
button.
To remove the schedule and already loaded master data, choose the Remove Semantic ID
button. The entry will then disappear from the list.
To change the frequency of the master data load, choose the Set Schedule Time
button.
To refresh the master data immediately, choose the Manual Master Data Reload
button. The data can take some minutes to be refreshed/reloaded, depending on the amount of data.
To delete master data, choose the Clear Master Data
button. A popup shows the languages in which the master data was last loaded. Select the languages for which you want to delete the master data.
To check the total amount of master data loaded, choose the Load/Reload Master Data Amount Details
button. To see the languages, click the number in the No. Languages (distinct)
column.
To schedule a new semantic ID that is not shown in the table, choose the Schedule New Semantic ID
button. In a popup, you can define the semantic ID, target system, and frequency.
In the Master Data Language Customizing
area, you can define the languages for which the master data are to be loaded. By default, descriptions are loaded in English for every system/client. Only load the languages that are required. You can append rows or change existing Customizing according to your requirements.