You use a project roadmap in an implementation project to document the progress of the project and to provide and distribute information to the project team.
System behavior when there are multiple language versions
If the contents of a project (e.g. structures, documents or SAP notes) are translated, the system displays them in the project language in the roadmap.
If possible, the system identifies the language version to be displayed, in Service Market Place URLs.
You have created a project in
Project Administration
and assigned a Roadmap for the project (see
Create/Change Project
).
You can control whether a team member can display and/or change a tab in the Roadmap, with the authorization object S_AIRMTAB.
The system lists Accelerators, e.g. Word documents, PowerPoint presentations and transactions, in the
Accelerator
tab.
Note
You can display a list of accelerators assigned to each structure element. Choose
. You can make notes about structure elements, in the
Status/Notes
tab. The system saves your entries automatically when you leave the tab.
To change the status of a structure element, choose the status symbol in front of the structure elements, or set the status with the pushbutton on the
Status/Notes
tab.
The status is passed upwards in the structure. If you change the status which was passed upwards, for a higher-level structure element, in the structure, the system flags the status of this structure element as set manually with an icon. You can reset the status of the structure element to the inherited status with the
Status
pushbutton.
You can assign the team members, who you have included in your project in
Project Administration,
on the
Project Team Members
tab page (see
Project Team Members
).
You can create and send messages in the
Messages
tab.
You can edit documents (see Edit Documents ).
You can use all general project documents and document types which you have assigned to your project in the Project Administration.
In the
Keywords
tab, you can assign the project-specific keywords, which you assigned to your project in the
Keywords
tab of
Project Standards
tab in the
Project Administration
, to each structure element. You can use these keywords to simplify searching for structure elements in project analyses (see
Analyses
).
You can pass on the keywords which you have assigned to a structure element, downwards in the structure, with the
Make Mass Changes
pushbutton in the Keywords tab. You can delete these keywords passed on to the lower-level structure element, with the Delete Entry pushbutton.