Show TOC

Expected Effort of the Test Package Locate this document in the navigation structure

Key Figure Key Figure: 0TWBPEFTPC

 

This key figure captures the expected amount of time needed to execute all the test cases of a test package, in minutes.

Note Note

By specifying the planning and reporting level for expected effort in the test plan attributes, you determine the result of your filtering by business process hierarchy nodes. If your planning level is at test package level, for example, the expected effort can only be aggregated at this level or at the higher level. Below this level, for example at test case level, the expected test effort cannot be broken down further due to missing granularity. As a result, the expected effort for test packages is automatically propagated to the test case level.

End of the note.

Technical Data

Available as of Release

BI_CONT 705 SP2

Aggregation

Minimum

Exception Aggregation

Summation

Calculation

No

Restriction

No

Data Modeling

Has aggregation-referenced characteristic

Object Type

Name

Technical Name

InfoObject

Status id

0TWBSTID