  Cross-System IMG Analysis

Use

Project analysis is based on the information that you can record for each activity in the Customizing (IMG) project. We refer to "IMG activities", but you can also record and analyze status information for project IMG structure nodes.

You can analyze data for a single project or for several projects, depending on the scope of your project or the purpose of your analysis.

Call up the report or a previously defined variant: Start of the navigation path Implementation/Upgrade Work Center Next navigation step Analyses Next navigation step Cross-System IMG Analysis. End of the navigation path

You can also analyze your Customizing project in the project administration.

  1. Select a project in the project overview.

  2. Choose Start of the navigation path Goto Next navigation step Project Analysis. End of the navigation path

  3. Choose IMG or an existing variant in the structure tree.

Features

Selection criteria

You can analyze one or more projects by the following criteria:

Selection criteria

Meaning

General project data

IMG structure node text

Resources

Project manager

Project team members

Keywords

Keywords

Status

Status

Percentage complete

Deadlines

Planned start

Planned Finish

Project start

Project end

Work resources

Planned resources

Current resources

Remaining resources (work required)

Documentation

Documentation types

Memo text

Memo

Management data

Created on

Created by

Last changed on

Last changed by

The following project analysis scenarios are possible:

  • Planned activities without actual data

    The system analyzes all activities whose planned start falls within the period you specified for Planned Start and for which no actual status information yet exists.

    Analysis criteria: Project number(s) , Planned start period, Current resources = initial (no values) , Remaining resources = initial (no values)

  • Activities not yet completed

    The system analyzes all activities for which the planned project end falls within the period you specified for Planned End , and which are not yet 100% complete.

    Analysis criteria: Project number(s) , Planned End period, Percentage complete < 100.

  • All activities started

    The system analyzes all activities for which the actual project start (from the actual status information data) falls within the period you specified for Project Start , and for which the actual project end is still open.

    Analysis criteria: Project number(s) , Project start period, Project end = initial (no value)

  • All completed activities

    The system analyzes all activities for which the actual project end (from the actual status information data) falls within the specified analysis period.

    Analysis criteria: Project number(s) , Project End period

  • Individual analyses

    You can perform individual analyses, as well as the analysis scenarios above, and define them as your default analyses. To be able to compare individual values in the analysis result to each other, you can calculate column totals.

    Example Example

    For example, you are implementing several projects and find that the planned resources calculated are incorrect and that you will probably need more time.

    To check the relation of the planned resources to the current resources, you analyze all activities that are not yet 100% complete. Then you calculate the total for the Planned Resources , Current Resources and Remaining Resources columns on the basis of the analysis result.

    Analysis criteria: Project number(s) , Planned resources , Current resources , Remaining resources , Percentage complete < 100.

    End of the example.