Procedure documentation Assign Logical Components to the Project  Locate the document in its SAP Library structure

Use

A logical component is an administration unit which uniquely assigns systems to system roles for a product, throughout the system landscape and across projects.

Prerequisites

You have created logical components in Solution Manager: Configuration Landscape Logical Components.

You have assigned logical components to technical systems and installed product instances under SAP Solution Manager Configuration Managed Systems Configuration. Select a technical system and choose Configure System. In the step Assign Product, choose Assign Logical Component.

For more information, see Managing Logical Components.

Procedure

...

To be able to call the functions in the table, you are in Project Administration, in the change mode of the project, in the System Landscape Systems subtab.

Systems tab

Function

Navigation

What you need to know

Copy new logical components from the current project structure

Select Scenario

 

Assignment of logical components to the project

Input help in the Logical Components  column

The system copies the logical components, their products/product instances, and the highest product version.

Create a new logical component

See Managing Logical Components.

 

Change an existing logical component

See Managing Logical Components.

Replace a logical component with another in the entire project structure

Replace Log. Component

 

Change the system roles, their sequence, and the assignment of system roles to project phases

System Role Assignment

You can also change the test system selected, at any time, in the Test Organization

Create user system roles and delete system roles for your project

System Role Assignment System Roles

You cannot delete system roles which are used in your system landscape

Create link between logical components

  Related Log. Comp.

You can, e.g. flag all logical components to which the same systems are to be assigned in future, as related.

 

The systems that you specify in the logical components for the system roles are used by default in the following project phases:

 

System role

Phase

Evaluation

Business Blueprint

Development

Realization

Quality assurance

Test

 

 