Function documentationNot-Started-on-Time Calculation Locate this document in the navigation structure

 

When using these metrics for your BO jobs or BW process chains, the system alerts a delayed start with respect to a check time (format hh:mm:ss). If a job has not yet started at the specified time, an alert will be raised. You can specify the single or multiple check times for a yellow and a red alert.

Note Note

The system always takes the expected starting time of a job that is closest to the actual starting point of the job or process chain as a reference.

End of the note.

Example

This graphic is explained in the accompanying text.

Not Started on Time Calculation

The graphic shows how the system assigns reference points to actual starting times, and how the metric values are calculated:

Case 1: The J1 start time is closest to the S1 reference time.

Case 2: The J2 start time is closest to the S2 reference time.

Case 3: The J3 start time is closes to the S3 reference time.

Case 4: No job has run within the scan time frame (36 hours).

Example 1

A job runs every hour. You have defined the fixed start time 9:00 a.m. as a reference time in the SAP Solution Manager configuration. If a job starts too late (compared to 9:00 a.m.) it is rated red. For example, a run on May 23 at 20:01 is too late for the reference time May 23, 9:00, so the system raises the red alert for “Not started on time”.

Example 2

The next run on May 23 at 21:01 is rated green, because the system compares every run to the nearest reference start time. As the nearest reference start time is May 24, 9:00, the process chain does not run too late. It actually starts too early, so it is not rated red, because only delayed jobs are rated red.