Expected Effort of the Test Plan Locate this document in the navigation structure

Key Figure Key Figure: 0TWBPEFTP

 

This key figure captures the expected amount of time needed to complete a test plan, in minutes.

Note Note

By specifying the planning and reporting level for expected effortin the test plan attributes, you determine the result of your filtering by business process hierarchy nodes. If your planning level is at test plan level, for example, the expected effort can only be aggregated at this level. Below this level, for example at test package level, the expected test effort cannot be broken down further due to missing granularity. As a result, the expected effort for test plans is automatically propagated to test package and test case levels.

End of the note.

Technical Data

Available as of Release

BI_CONT 705 SP2

Aggregation

Minimum

Exception Aggregation

Summation

Calculation

No

Restriction

No