Relocation of Technical Objects You can assign one or more technical objects of a force element to another force element by relocation. This can take place within an SAP system or between systems through change of ownership, utilizer, and holder (see also Distribution of Technical Objects ).
The technical objects could be aircraft, trucks, weapon systems, or boats, or even resources (tugs, cranes, and so on).
The following prerequisites must be met:
The technical object is assigned to a force element.
Number ranges are set for orders, notifications, and measurement documents (see also Number Range Monitoring ).
For changes to the master data or movement data, you have made the necessary settings in Customizing under .
After a goods issue has been posted, the system automatically makes the following changes to the master data and movement data in the target force element:
It changes the responsible work center and location/account assignment data of the highest-level functional location and master equipment to the new responsible work center of the target force element. The system determines the new responsible work center by searching upwards in the organizational structure. Inheritance ensures that the corresponding data is transferred to the technical objects of the functional location structure.
It changes the responsible work centers in maintenance items for technical objects to the responsible work centers of the target force element.
It changes the responsible work center in all orders and notifications for the technical objects that are still open.
You can prevent changes to the account assignment data in Customizing for .
For equipment for which the stock is in transit (stock type 06: transit), the receiving storage location from the related stock transport order is displayed. When equipment is displayed (transaction IE03), this information is displayed on the
Ser. Data
(serial data) tab.
You can use the relocation monitor to display the assignments of technical objects to the force element. You mainly use it to check the data in the target system and correct it if required. The relocation monitor checks whether:
the responsible work center has been changed
the location and account assignment data has been changed
You start the relocation monitor using transaction /ISDFPS/PMRELOC1 (SAPEasy Access menu: ).
The relocation process information displayed by the relocation monitor includes the following:
Equipment/Functional Location
structure for master equipment
Maintenance orders for master equipment as well as all objects of the
Equipment/Functional Location
structure
Notifications for master equipment as well as all objects of the
Equipment/Functional Location
structure
Maintenance plan items for master equipment as well as all objects of the
Equipment/Functional Location
structure
You can call the
Technical Report
at any time during the relocation process for each technical object to access detailed information about the status of the objects to be relocated. This report corresponds to the
status board
.
The following also applies for relocations across system boundaries:
Technical objects are first relocated from the central system to a decentralized system, then between any systems. The structure data of the technical object is always relocated from the sending to the receiving system.
Once relocation is complete, you can no longer make changes to the structure of the technical object (dismantle/install equipment) in the issuing system. This is ensured by the change authorization function.