Modification of Schedule LinesYou can:
Overwrite the schedule line quantity or the date of the schedule lines manually
Change schedule lines automatically using calculations
Delete schedule lines
Displace the dates of the schedule lines.
Change the quantities and dates for one schedule line or for several schedule lines.
In the schedule line tab page for maintaining the planned independent requirements, you can change existing schedule lines using the following arithmetic operations.
Add entered quantity to the schedule lines
Subtract the entered quantity from the schedule lines
Multiply the schedule lines by the number entered
Divide the schedule lines by the number entered
Enter a percentage of the schedule lines
Replace the schedule lines by the entered quantity
Round the schedule lines