Sample Scenario: Strategy 20 Stage 1: Demand Management
This stage does not apply to this strategy.
Stage 2: Procurement Before Sales
This stage does not apply to this strategy because there is no production without a sales order. If sales orders exist in the system in advance, production is performed before the required delivery date.
Stage 3: Sales Order and Allocation
A sales order is created.
Any quantity can be confirmed according to the ATP checking rule for a make-to-order environment,
AE
. The header text, which says
Availability Control
, indicates this is an availability check according to ATP logic.
The system finds the schedule line category CP and item category TAN because the item category group was set to NORM .
The system finds the requirements type
KE
(under the
Procurement type
tab title on the
Sales Order
screen because the strategy group has been set to
20
).
In this scenario, an order with a quantity of ten pieces is now entered with a required delivery date of today. This order can be confirmed after the replenishment lead time.
Once the sales order has been entered, the stock/requirements list displays the following information:
Date |
MRP element |
MRP element data |
Received/ required quantity |
Available quantity |
<today> |
Stock |
0 |
||
<today> |
Cstock |
000333/0010 |
0 |
|
<today> |
Order |
000333/0010/001 |
10 - |
10 - |
Note
he Cstock lines divide the total stock into independent customer sections.
Stage 4: Procurement After Sales
A procurement requisition is created in the MRP run ( ). The stock/requirements list displays teh following information:
Date |
MRP element |
MRP element data |
Received/ required quantity |
Available quantity |
<today> |
Stock |
0 |
||
<today> |
Cstock |
000333/0010 |
0 |
|
<today> |
Order |
000333/0010/001 |
10 - |
10 - |
<t+rlt> |
PlOrd. |
000214/Stck |
10 |
0 |
t + rlt = today + replenishment lead time
This procurement requisition is the starting point for production or external procurement. Various possibilities exist for handling the procurement process in the SAP system. One option would be to convert the planned order into a production order, then release the production order and a goods receipt for the yield quantity.
After processing a goods receipt for the order and running MRP a second time, the stock/requirements list displays the following information:
Date |
MRP element |
MRP element data |
Received/ required quantity |
Available quantity |
<today> |
Stock |
0 |
||
<today> |
Cstock |
000333/0010 |
10 |
|
<today> |
Order |
000333/0010/001 |
10 - |
0 |
Stage 5: Goods Issue for Delivery and Reduction of Planned Independent Requirements
After goods issue for the delivery (choose ), the stock/requirements list is reset.