Show TOC

Function documentationPlanning of Standard Lots for Conti I/O — Minimum Passing Amount

 

You can use the Planning of Standard Lots for Conti-I/O heuristic (SAP_PP_C001) to trigger pegging at an amount specified in the product master data. A minimum passing amount parameter has been added to allow this pegging.

Prerequisites

The following master data has been maintained:

  • Location

  • Products

  • PPM/PDS for PP-PI scenario

You have activated the business function SCM-APO-PPS, Continuous Production and Multi-Resource Scheduling (SCM_APO_PPDS_PI).

Activities

  1. Run transaction /SAPAPO/MAT1, select the product and location, and choose Change.

  2. Go to the Start of the navigation path Demand Next navigation step Pegging End of the navigation path tab screen.

  3. Select the Conti IO Pegging checkbox and enter a value in the Min. Pass Amount field.

    Save your changes.

  4. Run transaction /SAPAPO/RRP3 to access the Product View.

  5. Choose the appropriate product, location, and active planning version. Choose Continue (Enter) or press Enter.

  6. Choose Start of the navigation path Interactive Planning Next navigation step Heuristics Next navigation step Planning of Standard Lots for Conti- I/O End of the navigation path.

    The pegging takes place according to the minimum passing amount specified.