Stable Forward Scheduling You can use this heuristic to carry out multilevel finite scheduling in the detailed scheduling planning board and in the production planning run , in order to create a feasible short-term production schedule.
This heuristic uses the algorithm /SAPAPO/SFW_HEUR_FW_STABLE.
You use stable forward scheduling to resolve the following planning problems, across a number of production steps:
Backlog
Capacity overload
Violation of minimum intervals
Violation of validity intervals of orders
For more information about prerequisites and activities for using the detailed scheduling heuristics, see Detailed Scheduling Heuristics .