MRP-based Detailed Scheduling supports the creation of alternative modes in SAP APO for classified resources in SAP ERP for process industries.
The following master data has been maintained:
Location
Product
Resource
Alternative resources in SAP APO using resources classification
Basic process industry data for MRP-based Detailed Scheduling
You have activated the business function SCM-APO-PPS, Continuous Production and Multi-Resource Scheduling (SCM_APO_PPDS_PI
).
In the SAP ERP system, create a new characteristic, class, and resource.
Create a classification of the resource from
. Enter a brief description and save.Create another resource with the same classification.
In transaction C201
, enter appropriate master data details and create a master recipe.
On the Operation
tab, enter a description and save.
On the Classification
tab, double-click the Classification
column or select the operation and enter OPCA
.
The recipe is created with the operation description.
When a planned order is created with the classification defined above, the alternate mode is reflected in the SAP APO system.