Standard capacity Available capacity that determines the basic resource availability.
The standard available capacity of a resource has unlimited validity and is always the same. If you are not working with different shift sequences, then the standard available capacity is sufficient for planning.
You define the parameters for the standard available capacity for resources (single, multi, line, vehicle, and calendar resources) you planned with
PP/DS
on the
time-continuous capacity
tab page. Choose the
Available Capacity
pushbutton on this tab page to display the standard available capacity of the resource for the entire validity period as a list.
You define the parameters for the standard available capacity on the
SNP bucket capacity
for resources to be planned with
SNP
. Choose the
Available Bucket Capacity
pushbutton on this tab page to display the standard available capacity of the resource for the entire validity period as a list.