Time segment around a requirements date/time.
A procurement planning heuristic searches for a suitable receipt in the reuse interval. The heuristic may not use receipts whose availability date/time is outside the reuse interval.
The reuse interval is relevant to the following reuse modes :
Use suitable receipts
Re-explode plan
If there are several suitable receipts in the reuse interval, the system determines the receipt with the reuse strategy .