SCM-APO-PPS, Continuous Production and Multi-Resource Scheduling
Technical Name of Business Function |
|
Type of Business Function |
Industry Business Function |
Available From |
SAP enhancement package 2 for SAP Supply Chain Management (SCM) 7.0 |
|
Technical Usage |
SCM |
Application Component |
Production Planning and Detailed Scheduling (SCM-APO-PPS) |
Required Business Function |
Not relevant |
You can use this business function to optimize continuous production, particularly in process industry scenarios. An unplanned stoppage in continuous production can be an expensive and time-consuming factor in process industries; restarted operations can take several days to reach a level at which the required quality is produced. A continuous flow must therefore be ensured within specified boundaries. This can be achieved by adjusting the duration of production without changing the order quantity. For example, you can stretch or shrink operations to fill in gaps in the resource utilization.
You have installed the following components as of the version mentioned:
Type of Component |
Component |
Required for the Following Features Only |
|---|---|---|
|
Software Component |
|
Not applicable |
|
Software Component |
|
Not applicable |
Software Component |
|
Not applicable |
The heuristic SAP_PI_002
must be added to your heuristic profile for it to be accessible from the Detailed Scheduling Planning Board
, Product View
, or Product Planning Table
.
This function allows you to increase or decrease the duration of an operation to ensure continuous production on each resource and to eliminate gaps between operations. You can do this without changing the quantity or other parameters. This duration must be entered as a percentage of the original duration of the operation. For example, assuming the original duration of the operation as 100%, you can redefine it as 125% to stretch the operation to 125% of its original duration.
You can use the heuristic SAP_PI_002
to reduce or even eliminate any gaps between operations on a resource. You do this by reducing the rate, thereby stretching activities either forward or backward, as required.
You can use the heuristic SAP_MULT_SCH
to switch modes and sources of supply according to defined time blocks, so as to keep the receipts as close to the required date as possible. Multi-resource scheduling allows better compliance with due dates, supports finite
production planning scenarios with all alternative resources, and allows alternative resources to be modeled using modes or alternative sources of supply.
The Planning of Standard Lots for Conti- I/O heuristic (SAP_PP_C001
) has been enhanced with the capability of pegging at the amount specified in the product master data. A Minimum Passing Quantity
parameter has been added to allow
this pegging.
You can use the PP/DS Optimizer to support accurate pegging of incremental material output/input within continuous material production/consumption. The product master allows you to include a minimum passing amount to model this pegging.
This function can be used in carrying out detailed scheduling of continuous production using optimization. It is particularly useful in two-step production, where the material is produced continuously in the first step, but is made available only in incremental amounts for consumption in the second step.