| admissibility check (SCM-APO-PPS-CDS) |
Totality of all checks that take place when a forecast/planning (F/P) delivery schedule is received to determine whether the newly transmitted desired quantities are acceptable.
The admissibility check decides whether the F/P delivery schedule needs to be manually postprocessed or can be automatically further processed.
The following heuristic-based checks are supplied:
Typical example: Tolerance check between new due delivery schedule and last confirmed due delivery schedule.