Conversion from SAP APO with Forced BOM Explosion You can force a BOM explosion on conversion of a planned order into a manufacturing order. In this way you can ensure that the currently valid BOM is always used for production.
This function is only available with the enhancement PPAPO004 (
Planned Order Conversion from APO: New BOM Explosion?)
with the Customer Exit EXIT_SAPLCOXT_001.
For more information see the SAP Note 490414 –
Enforced BOM Explosion with Planned Order Conversion
.
SAP R/3 carries out the following steps automatically:
Creation of the manufacturing order using the data of the APO planned order
This means that the BOM and the routing are re-exploded in accordance with the production version.
Caution
In SAP R/3 no merge with the reservations and items of the APO planned orders takes place: instead the system always calls up the current BOM information from SAP R/3. However, operation data (dates and work centers) is copied to the R/3 order from SAP APO.
Saving of the manufacturing order
Deletion of the R/3 planned order