Integrate as Heuristic in Production Planning Run You can use this function if you want to carry out the model mix planning run periodically in the background (such as every night or every weekend).
The production planning run is provided within production planning and detailed scheduling in the APO System for periodic planning with heuristics. For further information see Production Planning Run .
In Customizing for Production Planning and Detailed Scheduling, you have to create a procedure package as a heuristic for the model mix planning run. To do this, enter the name of the procedure package as the heuristic, and the function module
/SAPAPO/SEQ_MODELMIX_RUN_01
as the function.
With the integration in the production planning run, you can have the system trigger a model mix planning run hourly, daily, weekly or monthly.
Choose to create a variant for background planning.
Enter the heuristic defined next to the global settings, under
Function/Heuristic
and the object 6 (
line networks
).
Choose
to show the selection fields of the lines, and then enter the lines you want.
Choose and schedule the variant periodically.