Completing the Product Master RecordsAfter transferring the iPPE data, you have to complete the product master records created in APO for the products to be planned as not all the necessary settings are transported from the material master records in the DI System.
In the product master record, in tab page
PP/DS
, in the
Plan explosion
field, enter indicator 3 (
Single explosion
) or 4 (
Matrix explosion
).
In the
Demand
tab page, check whether a
Proposed strategy
was transferred from the
DI System.
If none was transferred, enter strategy
20
, for example.
In the
Demand
tab page, in the
Pegging
section enter the value
100.000:00
in the field
Maximum lateness of a receipt
.