Start of Content Area

Procedure documentationMaintaining the Scope of Check

Use

You create the scope of check for the product availability check.

Prerequisites

You created a business event and an ATP group.

If you want to take into account non-SAP categories in the scope of check, you must have already created these.

Procedure

  1. You maintain a field catalog in Customizing for the Advanced Planner and Optimizer by choosing Global ATP ® Product Availability Check ® Maintain Check Control.
  2. Select an entry from the check control and choose the ATP Check Control: Scope of Check frame.
  3. Choose New entries.
  4. Using the input help (F4), choose the categories that you want to assign to an ATP group and a business event.
  5. Choose Save.