Start of Content Area

Query Production: Detail – Material – Target/Actual – Current Situation  Locate the document in its SAP Library structure

Technical name: 0PC_C01_Q0024

If you want to modify this query, note the special features of InfoCube 0PC_C01 Cost Object Controlling.

Use

This query displays a detailed target/actual comparison at the material level for the last closed period and for the actual costs of the previous period.

Note

This query is contained in the workbook Production: Detail – Material – Target/Actual – Current Situation.

For background information on the concept of queries, see Queries in Controlling.

Filters

InfoObject

Description of the Info Object (and restriction or calculation formula)

0PLANT

Plant (variable &0S_PLANT&)

0CURTYPE

Currency type (fixed value 70, currency of controlling object)

0FISCVARNT

Fiscal year variant (SAP exit variable &OP_FVAEX&: the system derives the fiscal year variant from the controlling area)

0CO_AREA

Controlling area (variable &OP_COAR&, controlling area)

User-Defined Characteristics

No user-defined characteristics are available for this query.

Rows

Row Name

Description of the Info Object (and restriction or calculation formula)

0MATERIAL_0PROD_HIER

Product hierarchy (variable &0I_PRODH&)

0MATERIAL

Material number (variable &0P_MAT&)

Columns

Column Name

Description of the Info Object (and restriction or calculation formula)

Target costs

Depends on the target cost version

Actual costs

Actual costs of previous period

Total variances

Depends on the target cost version

Variances

Depends on the target cost version

Actual costs

Actual costs of period before last

Target costs/unit

Target costs per unit

Actual output quantity

Output quantity of manufactured materials

Actual costs/unit

Actual costs per unit, previous period

Actual costs/unit

Actual costs per unit, period before last

Actual output quantity

Output quantity of manufactured materials