PSM: Orders for Cost Center: Plan/Actual -
Situation
Technical name: 0COOM_C02_Q0304
If you want to modify this query, note the special features of the InfoCube 0COOM_C02 CO-OM Costs and Allocations (Delta Extraction).
This query is a regular report for the cost center manager. It provides an overview of the actual and planned costs that were incurred during the reporting time frame on certain internal orders. These internal orders are those assigned to the cost center via the responsible cost center field in the order master. It enables you to make an actual and plan cost analysis, taking cost elements and variances into account.
You need to enter a controlling area when you call up the query. You can further restrict the displayed data using the cost center and the cost element interval. Choose either a single cost center or a cost center interval, and (if required) a cost element interval.
For background
information on the concept of queries, see
Queries in
Controlling.
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
0CO_AREA |
|
0CURTYPE |
|
0FISCVARNT |
|
0COSTCENTER |
|
0IOBJSV |
|
InfoObject |
Description |
0COORDER |
|
0FM_AREA |
|
0FUND |
|
0FUNC_AREA |
|
0GRANT_NBR |
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
0COSTELEMNT |
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
Previous period and cumulated up to current period (Use of the
|
Values from the previous period and the cumulated values up to the current period |
Planned costs (restricted key figure) |
Planned costs on an assigned internal order |
Actual costs (restricted key figure) |
Actual costs on an assigned internal order |
Variance (%) (restricted key figure)
|
Percentage variance between actual and planned costs on an assigned internal order (actual - plan) / plan |
The key figures planned costs, actual costs and variance are displayed for the previous period and cumulated up to the current period.
See also: