Technical Name: 0PERVAL
Use
This key figure describes the valuation of the material during the period when you are using the material ledger.
If you use price determination control 3 the valuation during the period is the equivalent of the preliminary valuation with the standard price.
If you use price determination control 2 the valuation during the period is the equivalent of the current valuation of the material either with the standard price or with the moving average price.
Technical Data
Available from Release |
4.6C |
Data Element |
KKB_ML_BEWER |
Unit |
0CURRENCY |
Aggregation |
Summation |