Query Production: Analysis – Plan/Actual  Locate the document in its SAP Library structure

Technical name: 0PC_C01_Q0004

If you want to modify this query, note the special features of InfoCube 0PC_C01 Cost Object Controlling.

Use

With this query you can analyze planned and actual costs at the level of materials or plants. You can select the materials in your area of responsibility. Powerful analysis functions facilitate investigation of the differences between planned and actual costs.

For example, you can expand this query by the following objects:

Note

This query is contained in the workbook Production: Analysis – Plan/Actual.

For background information on the concept of queries, see Queries in Controlling.

Filters

InfoObject

Description

0CURTYPE

Currency type (fixed value 70, currency of controlling object)

0CO_AREA

Controlling area (variable &OP_COAR&, controlling area)

0FISCVARNT

Fiscal year variant (SAP exit variable &OP_FVAEX&: the system derives the fiscal year variant from the controlling area)

0FISCPER

Fiscal year/period (variable &0I_FPER&)

User-Defined Characteristics

InfoObject

Description

0PLANT

Plant (variable 0S_PLANT)

0MATERIAL

Material number (variable &0S_MAT&)

0PRODORDER

Order number

0COSTELMNT

Cost element

0COMPONENT

BOM component

0COMPONENT_0MATL_GROUP

Material group

0COSTENTER

Cost center

0ACTTYPE

Activity type

Rows

Row Name

Description

0MATERIAL_PROD_HIER

Product hierarchy

Columns

Column Name

Description

Planned costs

Results of preliminary costing

Actual costs

Debits of the cost object

Variance

Actual costs – Planned costs, as percentage

Actual output quantity

Actual output quantity of manufactured materials (hidden)

Planned output quantity

Planned output quantity of materials to be manufactured (hidden)

Planned costs/unit

Planned costs per unit

Actual costs/unit

Actual costs per unit

 

Report/Report Interface

Query

Description

0PC_C01_Q0022

Production: Detail – Order – Plan/Actual

From the query drilldown level order, you can branch to the report Production: Detail – Order – Plan/Actual (0PC_C01_Q0022).