To use the Test Management functions of the Work Center in a meaningful way, your business processes must meet certain requirements:

  • You have assigned transactions to the scenarios, business processes or process steps.

  • A list of involved objects (Technical Bill of Materials, TBOM) is available for every transaction.

  • You have defined test cases for the scenarios and processes.

The TBOMs and related filter and weighting settings are the basis for the analysis of the business processes, which are affected by the changes.

This process guides you through the required steps.

Prerequisites

You have created a project or solution structure in the context of creating the business blueprint.

ST-PI is installed on the managed systems on which your processes are running.

You have the authorizations required for changing TBOMs. For further information, see the Security Guide SAP Solution Manager in the SAP Service Marketplace under   http://service.sap.com/instguides   SAP Components   SAP Solution Manager  .

Process

  1. You complete transactions and test cases for the relevant nodes of your business processes (see Assigning Transactions to a Structure Element and Test Cases Tab).

  2. You check the status of your business processes.

  3. You create TBOMs for all transactions.

  4. You configure the TBOM filter.

  5. You configure the TBOM weightings.

Additional activities in the preparation phase can be:

  • Delete TBOM

  • Lock or unlock TBOM

  • Check whether a TBOM is up-to-date

  • Update TBOM classification types

  • Calibrate TBOM anew

Result

Your business processes contain test cases and transactions with current TBOMs.

You have configured the TBOM filter and TBOM weightings.