Workbook Standard Cost Estimate: Time Series for Material, Level/Lower Level Costs  Locate the document in its SAP Library structure

Use

This workbook displays the overall costs incurred in the lower levels for a material in a plant across multiple periods, compared with the costs that were incurred in the last production level and with the overall costs in released material cost estimates. The costs are grouped into cost component groups. This enables you to track the changes in the costs of the lower levels and the last level in the individual cost component groups across time. You can also drill down in the cost component groups to the cost components.

For background information on the concept of workbooks, see Workbooks in Controlling.

Structure

Due to the restrictions that had to be made in the query, only certain cost estimates are displayed in this workbook. If you want to display other cost estimates, see the documentation on the query for more information.

The workbook contains the following query:

Technical Name of Query

Name and Short Description

InfoCube Use

0COPC_C09_Q0008

Standard Cost Estimate: Time Series for Material, Level/Lower Level Costs (expanded by cost component group 1)

CO-PC: Product Cost Planning – Released Cost Estimates (0COPC_C09)