PSM: Cost Center: Plan/Actual -
Situation
Technical name: 0COOM_C02_Q0303
If you want to modify this query, note the special features of the InfoCube 0COOM_C02 CO-OM Costs and Allocations (Delta Extraction).
This query is a regular report for the cost center manager. It provides an overview of the primary and secondary costs (actual and plan) that were incurred on a cost center in the current period, as well as the cumulated values up to the current period. The system determines variances from the difference between the actual and plan values.
For background
information on the concept of queries, see
Queries in
Controlling.
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
0CO_AREA |
|
0CURTYPE |
|
0FISCVARNT |
|
0COSTCENTER |
|
0IOBJSV |
|
InfoObject |
Description |
0FM_AREA |
|
0FUND |
|
0FUNC_AREA |
|
0GRANT_NBR |
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
0COSTELEMNT |
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
Previous period and cumulated up to current period (Use of the
|
Values from the previous period and the cumulated values up to the current period |
Plan (restricted key figure) |
Planned costs |
Actual (restricted key figure) |
Actual costs |
Variance (%) (restricted key figure) |
Percentage variance between actual and planned costs (actual - plan) / plan |
The key figures planned costs, actual costs and variance are displayed for the previous period and cumulated up to the current period.
See also: