Start of Content Area
wait time (PP)

Production Planning and Control (PP)

The time between the end of the execution time and the start of move time.

In the SAP system, types of wait time are:

In scheduling, only the minimum wait time is taken into account. The maximum wait time is used for information.

End of Content Area